With a technical team which is regularly trained with many years of experience, along with the dedication to work, we confident to say we can meet all of customer requirements.
- Design, supply and construction of the project inclusive of electricity, water, air-conditioning, lightning proof and environmental treatment equipment.
- Consulting, design, supply and construction of cooling systems, electric motors, electronics, systems and boiler pressure.
- Design, supply and construction of systems for liquefied gas pressure and gas industry.
- Training and transfer of new technologies in the field of air conditioning and automation.
- Training and transfer of new technology new material.
- Supply of machinery and industrial equipment.
- Provide all kinds of building materials
1. Total number of years’ experience in the construction and installation of air conditioning and ventilation
| Nature of work | Experience |
| 1. Design, supply and installation of air-conditioning air-cooling type cooling water (CARRIER, Trane, YORK) | 05 years |
| 2. Design, supply and installation of air-conditioning system intelligent VRV – DAIKIN, HITACHI, TOSHIBA, VRF system – FUJITSU, GENERAL, … | 05 years |
| 3. Thiết kế, cung cấp và lắp đặt thi công hệ thống đường ống gió cấp không khí lạnh, cấp khí tươi, hút thải công nghiệp, … | 05 years |
| 4. Design, supply and installation of air conditioning systems Daikin VRV type, Multi – V LG and generation MPS – Multi LG | 05 years |
| 5. Design, supply and installation of air-conditioning cooling type direct cooling air-conditioning Local – LG, CARRIER, FUJITSU, PANASONIC, … | 05 years |
2. The list of equipment construction:
| Description of device type |
The number of each type |
In production |
Owned |
Tenant |
Operational capacity |
|
| Welding power 1-phase and 3-phase type |
2 |
2007 |
2 |
– |
38 kW |
|
| Ultrasound Weld |
1 |
2002 |
1 |
– |
||
| O2 gas welding machine – Butane |
2 |
2002 |
2 |
– |
||
| Ministry of Gas Pipe Bending |
2 |
2010 |
4 |
|||
|
F22,22 |
||||||
| Ministry nong – flared copper pipe |
6 |
2010 |
8 |
F19,25 |
||
| 2H-125 drilling machine (drilling concrete and steel) |
6 |
2007 |
4 |
– |
2.2kW |
|
| Rod hydraulic punches |
1 |
2009 |
1 |
– |
350 mm2 |
|
| NTT Ministry bending cables |
1 |
2008 |
2 |
– |
F350 |
|
| Piston pumps water pressure pump |
1 |
2007 |
1 |
– |
0.7kW |
|
| Air compressor |
1 |
2008 |
1 |
– |
0.5kW |
|
| Grinding, cutting |
10 |
2009 |
8 |
– |
2kW |
|
| Hand Drill, Drill Concrete |
12 |
2009 |
8 |
– |
||
| Hoist, winch |
2 |
2009 |
3 |
– |
||
3. Human resources companies directly involved in construction:
| Qualifications |
Number of people |
|
| Refrigeration Engineer |
10 |
|
| Mechanical Engineer |
4 |
|
| Labor Protection Engineer |
1 |
|
| Automation Engineer |
3 |
|
| Bachelor of Economics |
2 |
|
| Economic College |
2 |
|
| Refrigeration college |
10 |
|
| 4/7 to 5/7 mechanic |
6 |
|
| Refrigeration workers |
30 |
|